Hs2 rail route uk1/31/2024 This page sets out detailed information on the Phase 2b route, including advice from HS2 Ltd to the Secretary of State, Department for Transport publications concerning the Phase 2b business case, plan and profile maps showing greater detail on the route as it is currently designed, and information on current and previous consultations. The UK Government initially set out to build a new high speed railway line connecting London with Birmingham, Manchester and Leeds, with HS2 trains. The working draft Environmental Statement gives those affected the chance to review and comment on initial assessments of the environmental impacts from HS2 Phase 2b. A hybrid bill for the Western leg, the High-Speed Rail (Crewe to Manchester) Bill, was introduced to Parliament on 24 January 2022. On the 10 October 2018 the Secretary of State announced a consultation on the working draft Environmental Statement for Phase 2b, which is a key part of preparing the future hybrid Bill to seek powers for its construction. Information on this page relates to the route as confirmed on 17 July. HS2 will be a Y-shaped rail network that will reduce journey times between Britains major population centres and improve capacity across the existing rail. On 17 July 2017, the Secretary of State for Transport announced his decisions on these refinements. In November 2016, the Secretary of State confirmed part of the Phase 2b route, whilst also announcing a consultation on seven route refinement areas. HS2 Phase 2b (Crewe to Manchester, and the West Midlands to Leeds).HS2 Phase Two is being delivered in 2 stages: The high-speed railway was initially set to link London and the West Midlands with a further phase extending to cities in the North. The latest round of updates will see the installation of new track at West View Lane and through to Dore and Totley Station, continuing the work to build a second railway line, platform and accessible footbridge at the station. It looks at how to deliver HS2 Phase 2b, Northern Powerhouse Rail, Midlands Rail Hub and other rail programmes better and more effectively. The government has announced the construction of sections of HS2 will be delayed by two years to save money. HS2 is a new high-speed rail line that in Phase One will connect London with Birmingham, and later with Manchester and Leeds. The UK Government has published an Integrated Rail Plan for the North and Midlands.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |